The technology

A new watergate with a chamber length of 115 meters, 12 meters chamber width and 2,5 meters depth was realized as part of the traffic project German Unit in Berlin Charlottenburg. The main sub is equipped with hydraulic stemming gates with integrated contactors. The head has a modern turn segment gate. Both heads are protected by a rope shock protection system.
The watergate operation is done fully automatic from the central control panel.

Automation System
  • 3 SIMATIC S7-400 networked over Profibus (optical ring)
  • Various ET200
  • Touchpanels in the caverns
  • Visualization via redundant InTouch system
realized
  • 2003– 2004
Scope of Work AVI
  • Engineering
  • Software
  • Control cabinets
  • commissioning
  • maintenance

Pictures

More Projects

Back to overview
Back to overview
Water
Water treatment plant Berlin Beelitzhof

Water treatment plant Berlin Beelitzhof

The Technology The Waterworks Beelitzhof of Berliner Wasserbetriebe at Wannsee supplied the entire southern Hochstadt and is therfore water utility...

Read more
Machine and Factory Automation
Production of Solar Cells BP Solar Madrid, Spain

Production of Solar Cells BP Solar Madrid, Spain

The Technology Vacuum coating systems for sputtering of silicon wafers as a starting material for the cells production of photovoltaic....

Read more