Start> References> Automation> Alba Berlin

Alba Berlin

The Technology

In Berlin two mechanical-physical sorting plants (MPS) for a total of 320,000 t / a of waste were built. The two almost identical plants have:  Mechanical pre-treatment, drying, sifting, pelleting, loading and exhaust purification.  

Automation System
  • The process control system consists of:
    • 2 server with 2 clients
    • engineering and archive-PC
    • five S7-400
    • 30 subordinate PU-PLC
    • extensive decentralized periphery
realized
  • 2004/2006
Scope of Work AVI
  • complete engineering,  equipment cabinet, commissioning

 

Bilder

More Projects

Back to overview
Back to overview
Mining and Bulk Handling
CTE Europoort Rotterdam

CTE Europoort Rotterdam

The Technology In the port of Rotterdam a new coal terminal was built by the consortium FAM Magdeburg and Siemens I&S. Automation...

Read more
Mining and Bulk Handling
Further References Mining and Minerals

Further References Mining and Minerals

Open Cast Mining Nochten, Germany Open Cast Mining Jänschwalde, Germany Open Cast Mining Hambach, Germany Open Cast Mining Garzweiler,...

Read more